Analisis Penjadwalan Proyek Menggunakan Metode PERT Pada Pembangunan Proyek Perumahan
DOI:
https://doi.org/10.52722/cbwkwm23Kata Kunci:
Project Evaluation Review Technique (PERT), perumahan, time scheduleAbstrak
Housing development is one of the important sectors in infrastructure development in a country. However, housing projects often faces challenges in terms of scheduling and time management. Therefore, project scheduling analysis is crucial to ensuret each stage of the project is completed on time and within predetermined budget. This study aims determine the processing time of the Tallasa City Alstonia cluster housing construction project using the Project Evaluation Review Technique (PERT) method of development, and to identify the critical activities in housing construction projects. The data collection method used includes direct field observation and the use of the available project time schedule to obtain information on the duration and sequence of each task. The collected data is then analyzed using the PERT method to estimate three times: optimal time, pessimistic time, and most likely/ realistic time. The results showed that the construction duration of the Alstonia Cluster housing project is 351 days, while the planned Time Schedule is 240 days. The conclusion of the PERT analysis indicates that the project is 111 days later than the planned time.
Unduhan
Referensi
[1] I. Raharja, “Analisa Penjadwalan Proyek Dengan Metode PERT di Pt. Hasana Damai Putra Yogyakarta Pada Proyek Perumahan Tirta Sani,” J. Teor. dan Terap. Bid. Rekayasa Sipil, vol. 2, no. 1, pp. 1–15, 2014.
[2] J. Oka dan D. Kartikasari, “Evaluasi Manajemen Waktu Proyek Menggunakan Metode PERT dan Cpm Pada Pengerjaan ‘Proyek Reparasi Crane Lampson’ Di Pt Mcdermott Indonesia,” J. Appl. Bus. Adm., vol. 1, no. 1, pp. 28–36, 2019, doi: 10.30871/jaba.v1i1.1257.
[3] A. Angelin dan S. Ariyanti, “Analisis Penjadwalan Proyek New Product Development Menggunakan Metode Pert Dan Cpm,” J. Ilm. Tek. Ind., vol. 6, no. 1, pp. 63–70, 2019, doi: 10.24912/jitiuntar.v6i1.3025.
[4] I. Tangdan, “Penerapan Manajemen Waktu Pada Pembangunan Basement Proyek 31 Sudirman Suites Makassar,” Paulus Civil Engineering Journal, vol. Vol 5, no. 1, pp. 144–150, 2023.
[5] D. Perwitasari, A. Fahreza, dan K. R. Ririh, “Analisis Percepatan Waktu Proyek Perumahan Menggunakan Metode PERT dan Fast Track,” RekaRacana J. Tek. Sipil, vol. 7, no. 1, p. 12, 2021, doi: 10.26760/rekaracana.v7i1.226.
[6] N. M. E. Wardani, S. Musdalifah, dan D. Lusiyanti, “Optimalisasi Biaya Dan Waktu Pelaksanaan Proyek Pembangunan Perumahan Citraland Palu Menggunakan Metode Program Evaluation and Review Technique (Pert) – Critical Path Method (Cpm),” J. Ilm. Mat. Dan Terap., vol. 15, no. 2, pp. 197–208, 2018, doi: 10.22487/2540766x.2018.v15.i2.11353.
[7] J. Masinambow, “Penjadwalan Pembangunan Menara Alfa Omega Di Kota Tomohon Dengan Menggunakan Metode Pert (Program Evaluation and Review Technique),” J. Ilm. Realt., vol. 15, no. 2, pp. 121–128, 2019, doi: 10.52159/realtech.v15i2.94.
[8] G. Bere, R. Maulana, O. H. Ardian, dan S. N. Sari, “Analisis Penjadwalan Proyek Menggunakan Metode PERT A (Proyek Pembangunan Gedung DPRD Kabupaten Sleman Daerah Istimewa Yogyakarta),” STORAGE J. Ilm. Tek. dan Ilmu Komput., vol. 3, no. 1, pp. 63–71, 2024, doi: 10.55123/storage.v3i1.3140.
[9] Amiruddin Hi, “Optimasi Pelaksanaan Proyek Dengan Menggunakan PERT Dan CPM,” Thesis, Universitas Atma Jaya Yogyakarta, 2022.
[10] L. A. Indriani, S. R. Gunawan, dan S. Fauziah, “Penerapan Manajemen Proyek Dengan Metode CPM (Critical Path Metode) dan PERT (Project Evaluation And Review Techinque) Pada Proyek Pembangunan Perumahan Puri Tanjung Permai Di Jampang kulon,” J. Teslink Tek. Sipil dan Lingkung., vol. 1, no. 1, pp. 1–8, 2023, [Online]. Available: https://teslink.nusaputra.ac.id/index
[11] D. Sudiantini, “Analisa Penjadwalan Proyek Dengan Menggunakan PERT Di Pt Summarecon Agung Tbk Pada Perumahan Summarecon Bogor,” Neraca Manajemen, Ekon., vol. 3, no. 8, 2024.
[12] A. N. Roziya, I. Purnamasari, dan Wasono, “Penjadwalan Proyek Dengan Metode Program Evaluation and Review Technique (PERT),” J. Eksponensial, vol. 9, no. 2, pp. 105–110, 2018, [Online]. Available: http://jurnal.fmipa.unmul.ac.id/index.php/exponensial/article/view/305/138
[13] S. C. Aprillia, Wasono, dan Q. Q. A’yun, “Optimalisasi Biaya dan Waktu Pelaksanaan Pembangunan rumah tinggal di Kecamatan Rantau Pulung Kutai Timur menggunakan Critical Path Method ( CPM ) dan Program Evaluation and Review Technique ( PERT ),” BASIS J. Ilm. Mat., vol. 2, no. 1, pp. 11–24, 2023, [Online]. Available: http://jurnal.fmipa.unmul.ac.id/index.php/Basis/article/view/1000
[14] G. W. Silo, J. E. Latupeirissa, dan A. Kusuma, “Analisis Penjadwalan Pembangunan Intake Bendungan Karalloe Paket II Kabupaten Gowa dengan Metode PERT,” Paulus Civ. Eng. J., vol. 3, no. 1, pp. 92–98, 2021, doi: 10.52722/pcej.v3i1.211.
[15] S. Suherman, “Analisa Penjadwalan Proyek Menggunakan PDM dan Pert Serta Crash Project (Studi kasus: Pembangunan Gedung Main Power House PT. Adhi Karya),” J. Tek. Ind. J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. 2, no. 1, p. 31, 2016, doi: 10.24014/jti.v2i1.5061.