Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Atap Pada Pembangunan Sekolah Dasar Al-Azhar Summarecon Mutiara Makassar
DOI:
https://doi.org/10.52722/rgj13t10Kata Kunci:
productivity, school, workerAbstrak
The success of a construction project heavily depends on the availability and role of labor. In its implementation, labor productivity capacity is crucial to achieving optimal results. In the construction of Al-Azhar Summarecon Mutiara Makassar Elementary School, a study was conducted aimed at analyzing labor productivity, particularly in the installation of wide flange steel roof trusses. This research was carried out through direct field observations to measure labor productivity, which was then compared with the SNI 7393:2008 standard. Based on the analysis, the average productivity of workers in the installation of wide flange steel roof trusses was found to be 99.34 kg/man-hour. Meanwhile, the productivity according to SNI standards for the installation of wide flange steel roof trusses is 166.6 kg/man-hour. This indicates that the labor employed in the process of installing wide flange steel roof trusses is not productive.
Unduhan
Referensi
[1] H. Pramesti dan B, Priyanto, “Analisa Produktivitas Tenaga Kerja dan Harga Satuan Pekerjaan Pada Pekerjaan Pasangan Dinding Bata Ringan,” J. Civ. Eng. Build. Transp., vol. 7, no. 1, hlm. 38–45, Mar 2023, doi: 10.31289/jcebt.v7i1.9082.
[2] L. A. M. D. Lirawati, “Analisis Faktor Keterlambatan Proyek Konstruksi Bangunan Gedung,” J. Tek. Maj. Ilm. Fak. Tek. UNPAK, vol. 21, no. 2, Nov 2021, doi: 10.33751/teknik.v21i2.3282.
[3] D. Sambolangi, J. E. Latupeirissa, dan H. C. P. Tiyow, “Analisis Perbandingan Produktivitas Tukang Pada Pekerjaan Pasangan Dinding Bata Merah di Proyek Dengan SNI (Studi Kasus Proyek Pembangunan Perumahan Esa Garden Residence),” Paulus Civil Engineering Journal, vol. 6, no. 2, 2024.
[4] T. A. Siagian, F. Puspita, Juwindah, E. A. Thia, I. Wahyudi, dan A. Sulaiman, “Pengembangan Sumber Daya Manusia pada Masyarakat Desa Padang Jawi Melalui Manajemen Sumber Daya Manusia,” TRIBUTE J. COMMUNITY Serv., vol. 3, no. 2, hlm. 65–71, Des 2022, doi: 10.33369/tribute.v3i2.23677.
[5] N. Kartika, S. M. Robial, dan A. Pratama, “Analisis Produktivitas Tenaga Kerja pada Pekerjaan Kolom di Proyek Pembangunan Gedung PemDa Kabupaten Sukabumi,” J. MOMEN Tek. SIPIL, vol. 3, no. 2, hlm. 103, Jan 2021, doi: 10.35194/momen.v3i2.1207.
[6] F. R. Rustan, T. S. Soeparyanto, dan D. W. W. Adyaksa, “Produktivias Kerja Pekerja dalam Pemasangan Rangka Atap Baja Perumahan Ditinjau dari Segi Segi Labour Utilization Rate,” FROPIL Forum Prof. Tek. Sipil, vol. 8, no. 1, hlm. 17–24, Jun 2020, doi: 10.33019/fropil.v8i1.1719.
[7] Hariyanto, Y. S. Astutik, dan A. J. Saputra, “Analisis Kelayakan Studi Pada Proyek Pembangunan Ruko Di Batam (Studi Kasus Pada Pembangunan Ruko Papa Mama Residence),” J. Aspir. Tek. Sipil, vol. 1, no. 1, hlm. 15–24, Jun 2023, doi: 10.35438/aspal.v1i1.7.
[8] D. Perkasa, “Analisis Produktivitas Tenaga Kerja Dengan Metode Field Ratings (Studi Kasus: Pekerjaan Penulangan Pelat Di Proyek Gedung Sudirman Place Jakarta Lantai 1),” NUCLEUS, vol. 3, no. 1, Jul 2022, doi: 10.37010/nuc.v3i1.744.
[9] B. B. Louhenapessy, A. R. Mustar, R. Lukiawan, dan N. Aliyah, “Kesiapan Standar Nasional Indonesia (SNI) Produk Prioritas Menghadapi Masyarakat Ekonomi ASEAN (MEA),” J. Stand., vol. 17, no. 1, hlm. 75, Agu 2016, doi: 10.31153/js.v17i1.307.
[10] F. Razi, “Efisiensi Penggunaan Dimensi Balok Wide Flange (WF) terhadap Kekakuan Struktur Gedung BPJN Aceh dengan Penambahan Elemen Shear Wall,” J. Syntax Admiration, vol. 2, no. 6, hlm. 1042–1053, Jun 2021, doi: 10.46799/jsa.v2i6.260.
[11] S. Perdana, “Kebijakan Hukum Terhadap Perlindungan Tenaga Kerja yang Mengalami Kecelakaan Kerja,” Inovasi, vol. 20, no. 1, hlm. 55–61, Mei 2023, doi: 10.33626/inovasi.v20i1.669.
[12] M. K. R. Kata dan J. Mara, “Tinjauan Produktivitas Tenaga Kerja pada Pekerjaan Struktur Proyek Konstruksi,” Paulus Civil Engineering Journal, vol. 6, no. 1, 2024, doi: 10.52722/n2112g34.
[13] M. Natalia, F. Adibroto, dan R. Lubis, “Perbandingan Produktivitas Tenaga Kerja Dengan Metode Time Study Terhadap AHSP SNI 2016,” Siklus J. Tek. Sipil, vol. 6, no. 2, hlm. 155–166, Okt 2020, doi: 10.31849/siklus.v6i2.4749.
[14] A. P. Zebua dan A. B. Nusa, “Amalisis Waktu dan Biaya Berdasarkan Produktivitas Tenaga Kerja pada Proyek Rehabilitasi Kantor KONI,” Bul. Utama Tek., vol. 19, no. 3, hlm. 192–195, Agu 2024, doi: 10.30743/but.v19i3.9875.
[15] B. Dwipurwanto, “Analisis Produktivitas Tenaga Kerja Pemasangan Dinding Bata Ringan Dengan Metode Work Sampling Pada Pembangunan Rusun Surabaya,” INTER TECH, vol. 1, no. 1, hlm. 22–27, Mei 2023, doi: 10.54732/i.v1i1.1021.


