Penerapan Sistem Manajemen Iso 9001:2015 Pada Proyek Pembangunan Gedung Parkir Mall Panakkukang
DOI:
https://doi.org/10.52722/a72m8109Keywords:
construction , project quality , , Quality Management System , ISO 9001:2015Abstract
This study examines the implementation of ISO 9001:2015 in quality management for the construction project of the Panakkukang Mall parking building. The primary objective of this research is to evaluate the effectiveness of applying this quality management standard in enhancing project quality and customer satisfaction. The method used is a descriptive approach, with data collected through observation, interviews, and documentation. The findings indicate that the implementation of ISO 9001:2015 significantly contributes to improvements in managerial processes, quality control, and communication among all parties involved in the project. The involvement of all team members in applying this standard has also proven to enhance their understanding, awareness of responsibilities, and the quality of their work. However, challenges remain in implementation, such as staff training and the provision of adequate resources. This study aims to provide recommendations to developers and contractors to further optimize the application of quality management systems for achieving better outcomes in future construction projects.
Downloads
References
[1] S. T. Kurniawan and J. Johan, “Evaluasi Pengaruh Penerapan Sistem Manajemen Mutu Iso 9001:2015 Untuk Kepuasan Pengguna Jasa Di Pt X Ditinjau Dari Sisi Pelaksana,” J. Muara Sains, Teknol. Kedokt. dan Ilmu Kesehat., vol. 6, no. 2, pp. 211–216, 2022, doi: 10.24912/jmstkik.v6i2.12252.
[2] N. Wulandari and H. Sholihin, “Analisis Penerapan Sistem Manajemen Mutu ISO 9001:2015 Terhadap Kinerja Karyawan Konstruksi (Studi Kasus : Proyek Pembangunan Tugu Pal Nol Tahap II Banjarmasin) Tomy,” Tjyybjb.Ac.Cn, vol. 27, no. 2, pp. 58–66, 2020.
[3] A. Hairuddin, H. Ashad, and S. Bachmid, “Analisa Sistem Manajemen Mutu ISO 9001:2015 Pada Proyek Pembangunan Gedung Pusat Pelayanan Haji Dan Umrah Terpadu (PLHUT) Kabupaten Jeneponto,” J. Konstr. Tek. Infrastruktur, dan Sains, vol. 01, no. 10, pp. 1–11, 2022.
[4] A. C. Sianturi, I. Kustiani, and A. M. Siregar, “Implementasi Sistem Manajemen Mutu ISO 9001:2015 PT Nindya Karya(Persero) pada Proyek Constructing of Nine (9) New Buildings andSupporting Infrastructures of UIN Raden Fatah Palembang,” J. Rekayasa Sipil dan Desain, vol. 8, no. 4, pp. 721–732, 2020.
[5] S. Isnaini, F. Syukur, and A. Khunaifi, “Implikasi Penerapan Sistem Manajemen Mutu ISO 9001:2015 di Madrasah (Studi Kasus di Madrasah Aliyah Nahdlatul Ulama Banat, Kudus, Indonesia),” Jawda J. Islam. Educ. Manag., vol. 1, no. 1, pp. 14–24, 2021, doi: 10.21580/jawda.v1i1.2020.6680.
[6] V. Issue, A. V. Hardiyanti, and F. Pulansari, “Analisis Perbedaan Aliran Harian dan Muka Air Harian Terhadap Data Debit Menggunakan Two - Way Anova dengan Mendukung Penerapan Sistem Manajemen Mutu ISO 9001 : 2015,” JUTIN, vol. 8, no. 1, 2025.
[7] M. F. Azfa and R. H. Solihah, “Penerapan Sistem Manajemen Mutu ISO 9001 : 2015 dalam Mendukung dan Menunjang Pemasaran Produk,” J. Inf. Syst. Manag., vol. 02, no. 04, pp. 15–24, 2023.
[8] A. D. Azahra and D. N. Putri, “Analisis Penerapan Sistem Manajemen ISO 9001:2015 di Sekolah Dasar,” J. Inf. Syst. Manag., vol. 02, no. 03, pp. 86–96, 2023, [Online]. Available: https://jisma.org
[9] S. Petryk, I. Andrieiev, D. Tishko, A. Kurbanov, and V. Yunger, “The Effectiveness of Quality Management Strategies in Health Care Organizations: an analysis of quality standards implementation and clinical performance improvement,” Rev. Amaz. Investig., vol. 12, no. 68, pp. 333–345, 2023, doi: 10.34069/ai/2023.68.08.31.
[10] D. Lusiani, Khofifah, Hasanah, and Muzayyin, “Penertiban Administrasi Berdasarkan ISO 9001:2015 Di Bagian Umum Perumda Kahyangan Jember,” J. Indones. Soc. Soc., vol. 2, no. 2, pp. 79–87, 2024, doi: 10.59435/jiss.v2i2.231.
[11] N. Novita, A. F. Edriani, and A. Gunawan, “Identifikasi Sistem Manajemen Mutu Berbasis ISO 9001:2015 Pada Perusahaan Penyedia Jasa Konstruksi Di Kota Bengkulu,” Teras J. J. Tek. Sipil, vol. 13, no. 1, p. 221, 2023, doi: 10.29103/tj.v13i1.818.
[12] D. Lasa, J. E. Latupeirissa, and L. D. R.KS, “Implementasi Sistem Manajemen Mutu ISO 9001:2015 Pada Proyek Pembangunan Gedung Ciputra School of Business Makassar,” Paulus Civ. Eng. J., vol. 4, no. 1, pp. 14–25, 2022, doi: 10.52722/pcej.v4i1.373.
[13] P. Wirawan and W. Putra, “Strategi Peningkatan Kualitas Pelayanan Kesehatan Melalui Implementasi Sistem Manajemen Mutu ISO 9001 : 2015 Paradigma New Public Service dalam Kualitas Pelayanan Publik Management , beralih ke prinsip paradigma New Public Service dalam administrasi,” JRIME, vol. 3, no. 1, 2025.
[14] A. Musyawir, . N., B. A. Razaq, and M. Amir, “Korelasi Penerapan Sistem Manajemen Mutu Iso 9001:2015 Terhadap Biaya, Mutu, dan Waktu (Studi Kasus: Proyek Pembangunan Gedung Stasiun dan Jalur KA Lintas Makassar-Parepare),” J. Appl. Civ. Environ. Eng., vol. 2, no. 1, p. 22, 2022, doi: 10.31963/jacee.v2i1.3421.
[15] L. Dintara, “Analisis Penerapan Sistem Manajemen Mutu Iso 9001 : 2015 Dalam Mempengaruhi Kualifikasi Akademik Karyawan ( Studi Kasus Pada PT Sarana Utama Adimandiri ),” JSSR, vol. 3, no. 2, pp. 53–61, 2025.