Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Current
Archives
About
About the Journal
Submissions
Privacy Statement
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 4 No. 1 (2024): Paulus Civil Engineering Research
Vol. 4 No. 1 (2024): Paulus Civil Engineering Research
Published:
2024-11-02
Artikel
PENGENDALIAN BIAYA MATERIAL DENGAN METODE IDENTIFIKASI VARIAN PADA PROYEK KONSTRUKSI GEDUNG SMP NEGERI 1 MAMASA
Zainuddin, Melly Lukman, Erni Rante Bungin (Author)
1-7
ANALISIS BIAYA DAN WAKTU DENGAN METODE EARNED VALUE (STUDI KASUS: PEKERJAAN PEMBANGUNAN GI 150 KV DONGGALA NEW)
Renaldo Jefta Wiriencius, Melly Lukman, Jonie Tanijaya (Author)
8-11
ANALISIS KINERJA MANAJEMEN SUMBER DAYA MANUSIA TERHADAPPENINGKTAN KUALITAS PERUSAHAAN KONTRUKSI DI MAROS-SULAWESI SELATAN
Yunus Seru, Jonie Tanijaya, Melly Lukman (Author)
13-20
ANALISIS FAKTOR PENYEBAB KETERLAMBATANPADA PROYEK PEMBANGUNAN GEDUNG 1 DAN 2 UNIVERSITAS SULAWESI BARAT
Lesipati Lika Toding, Jonie Tanijaya, Rais Rachman (Author)
21-27
ANALISIS REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PERTANIAN DAN TANAMAN PANGANKABUPATEN RAJA AMPAT
Absalom E Windeay, Melly Lukman, Erni Rante Bungin (Author)
28-32
Language
English
Bahasa Indonesia