Optimisasi Manajemen Material Konstruksi dengan Pendekatan Just In Time
DOI:
https://doi.org/10.52722/50dzdd50Keywords:
Building construction projects, Just In Time, Material ManagementAbstract
The Just In Time (JIT) method is a method to save inventory and material storage costs in storage warehouses by supplying the required materials from suppliers on time. Therefore, the application of construction material management using the JIT method in a project is very important to help reduce material storage and procurement costs. By reducing the amount of materials stored at the project site, the company can save on storage costs and reduce the possibility of damage or loss of materials. This study of the JIT method was carried out on the construction of the regional office building of the Directorate General of Customs and Excise of South Sulawesi, to find out how the application of JIT can optimize construction material management. In The method used in this research is a comparison technique, namely by comparing material inventory management practices at the project site. comparing material inventory management practices at the project site with using JIT principles using primary data, namely observation and interviews while secondary data is logistical data. The results show that the JIT inventory management method is not applied in material inventory in the construction project of the regional office building of the Directorate General of Customs and Excise of South Sulawesi. In this study, material ordering that applies the JIT approach is known to optimize material management in the implementation of construction projects, so that there are no delays that can hinder work.
Downloads
References
[1] M. Purnamasari, Nurleli, dan E. Fitriah, “Analisis Penerapan Just In Time (JIT) dalam Meningkatkan Efesiensi Biaya Produksi,” J. Ris. Akunt., vol. 1, no. 1, hlm. 9–14, Jul 2021, doi: 10.29313/jra.v1i1.52.
[2] J. M. Simanullang, “Identifikasi Added and Non-Value Added activities Melalui Analisis Just In Time Pada Pekerjaan Pondasi Bore Pile,” J. Inov. Konstr., vol. 3, no. 2, hlm. 68–77, Okt 2024, doi: 10.56911/jik.v3i2.119.
[3] A. Qatrannada, “Manajemen Baja Tulangan Dengan Metode Just In Time (Studi Kasus Proyek Pembangunan Gedung X),” FROPIL Forum Prof. Tek. Sipil, vol. 10, no. 2, Des 2022, doi: 10.33019/fropil.v10i2.3306.
[4] Syarif, M., Purnama, H., Latupeirissa, J. E., Gusty, S., Putri, T. S., Latif, F., Ode, L Wiriantari, F., & Pagoray, G. L. (2023). Manajemen Proyek Konstruksi. TOHAR MEDIA, ISBN: 623-8148-77-2
[5] B. Candrakanta dan A. Widodo, “Analisis Kebutuhan Material Pembesian Pada Satu Sampel Area Struktur Bangunan Gedung,” SENDI, vol. 01, no. 02, doi: https://doi.org/10.33365/sendi.v1i02.572.
[6] F. M. Dinar, “Menejemen Material Pada Proyek Konsrtuksi Jalan Dan Parkir Gudang Indolosir Sukabumi,” Structure, vol. 5, no. 2, hlm. 118–123, 2023, doi: http://dx.doi.org/10.31000/civil.v5i2.8855.
[7] S. G. P. Bachmid, A. K. T. Dundu, dan J. B. Mangare, “Manajemen Persediaan Material dengan Menggunakan Economic Order Quantity pada Preservasi Jalan Beton Simpang Niam - Lubuk Kambing 1, Jambi,” JTS, vol. 21, no. 83, 2023, doi: https://doi.org/10.35793/jts.v21i83.46542.
[8] A. Ariesty, M. R. La Ola, dan R. Irfanto, “Penerapan Konsep Just in Time pada Proyek Renovasi Gedung CITIE/CIBE/CADL ITB,” J. Teknol. Rekayasa, vol. 3, no. 1, hlm. 129, Jun 2018, doi: 10.31544/jtera.v3.i1.2018.129-136.
[9] W. V. N. Putri Silvia Istiqomah, “Pengaruh Implementasi Konsep Just-in-Time terhadap Efisiensi Operasional dan Pengendalian Biaya di Perusahaan Manufaktur (Studi Kasus PT Waskita Karya Tbk),” Jul 2023, doi: 10.5281/ZENODO.8117594.
[10] E. R. Ahadian, “Studi Manajemen Persediaan Just In Time pada Proyek Konstruksi Gedung KPP Menteng,” TECHNO J. Penelit., vol. 6, no. 01, hlm. 27, Des 2017, doi: 10.33387/tk.v6i01.553.
[11] M. Y. Syafei dan I. Andriana, “Analisis Manajemen Pengadaan Material Konstruksi Di PT. Takenaka Indonesia,” JIE, vol. 7, doi: https://doi.org/10.33021/jie.v7i2.3695.
[12] P. Azzahra dan R. Respati, “Analisa Pengaruh Manajemen Material Terhadap Produktivitas Kerja Pada Proyek Konstruksi Gedung Bertingkat Di Kota Palangka Raya: Analysis Of The Effect Of Material Management On Work Productivity In Multi-Storey Building Construction Projects In Palangka Raya City.,” Media Ilm. Tek. Sipil, vol. 12, no. 2, hlm. 159–166, Mei 2024, doi: 10.33084/mits.v12i2.7323.
[13] P. E. Suhardiyani, I. P. Widyarsana, dan N. K. S. E. Yuni, “Analisis Pengaruh Manajemen Material Terhadap Kualitas Kinerjapelaksanaan Proyek Konstruksi Gedung Di Kota Denpasar,” J. Ilm. MITSU Media Inf. Tek. Sipil Univ. Wiraraja, vol. 10, no. 1, hlm. 41–52, Apr 2022, doi: 10.24929/ft.v10i1.1540.
[14] P. Nuryani dan E. R. Aalin, “Comparative Analysis Of Economic Order Quantity (Eoq) Method With Just In Time (Jit) Method As Planning And Controlling Of Batako Raw Material Supply At Ud. Ulinnuha,” Balance J. Islam. Account., vol. 2, no. 01, hlm. 43–58, Sep 2021, doi: 10.21274/balance.v2i01.4760.
[15] D. K. Prasetyo, “The Impact Of Kanban Implementation In Optimizing Material Procurement On Construction Project Timeliness,” . JSRD., vol. 7, no. 1, doi: https://doi.org/10.56670/jsrd.v7i1.832.