Identification of Risks Affecting the Performance of Construction Time for Bandaraya Apartment

Authors

  • Anugrah Mangaruk Universitas Kristen Indonesia Paulus Author
  • Josefine Ernestine Latupeirissa Universitas Kristen Indonesia Paulus Author
  • Herby Calvin Pascal Tiyouw Universitas Kristen Indonesia Paulus Author

DOI:

https://doi.org/10.52722/zeye5650

Keywords:

Risk Identification, Implementation Time Performance, Bandaraya Apartment

Abstract

Construction projects are always associated with hazards or obstacles during the construction phase in the current era of globalization. Because these risk factors are dynamic and can change, risk variables are difficult to predict. The purpose of this study is to pinpoint the risk variables that have an impact on how quickly the Makassar FKS Bandaraya Apartment will be built. This research was conducted for 20 days at the FKS Makassar Bandaraya Apartment development project. The time performance analysis carried out on the Bandaraya Apartment project from the research period August – September 2022 shows that there has been a delay in the implementation of the project's 5 floor slab casting compared to the implementation of the project plan. the conclusion of the research results is that high-level threats require a fast response, including completing work that takes longer than expected, using BMKG weather forecast information, and taking preventive action if the weather changes.

Downloads

Download data is not yet available.

References

[1] I. G. A. A. I. Lestari, I. G. A. Diputera, K. Kurniari, N. K. A. Natalia, dan I. G. P. W. D. Arsana, “Identifikasi dan Analisis Risiko Perencanaan Pembangunan Mall Grand Outlet Bali di Kawasan Serangan,” GANEC SWARA, vol. 18, no. 4, hlm. 2355, Des 2024, doi: 10.35327/gara.v18i4.1126.

[2] E. Sirait, E. H. Manurung, A. Mubarok, dan S. Suripto, “Faktor-Faktor Yang Mempengaruhi Tingkat Risiko Pada Proyek Konstruksi Infrastruktur,” J. Rekayasa Konstr. Mek. Sipil JRKMS, vol. 6, no. 1, hlm. 41–47, Mei 2023, doi: 10.54367/jrkms.v6i1.2556.

[3] F. Moi dan I. G. A. N. Purnawirati, “Analisis Manajemen Risiko Pada Proyek Pembangunan Ruas Jalan Baru Waebetu – Tarawaja,” J. Talenta Sipil, vol. 4, no. 1, hlm. 79, Feb 2021, doi: 10.33087/talentasipil.v4i1.52.

[4] M. Faisal dan A. T. Tenriajeng, “Analisis Risiko pada Tahap Pelaksanaan Konstruksi Jalan Tol Cinere-Jagoeawi, Depok,” J. Kacapuri J. Keilmuan Tek. Sipil, vol. 4, no. 2, hlm. 223, Feb 2022, doi: 10.31602/jk.v4i2.6429.

[5] O. Okudan, C. Budayan, dan I. Dikmen, “A knowledge-based risk management tool for construction projects using case-based reasoning,” Expert Syst. Appl., vol. 173, hlm. 114776, Jul 2021, doi: 10.1016/j.eswa.2021.114776.

[6] C.-L. Lin dan B.-K. Chen, “Research for Risk Management of Construction Projects in Taiwan,” Sustainability, vol. 13, no. 4, hlm. 2034, Feb 2021, doi: 10.3390/su13042034.

[7] M. Afiq, “Manajemen Risiko pada Proyek Pembangunan Gedung Asrama Mahasiswa UIN Walisongo Tahun 2021,” Akselerasi J. Ilm. Tek. Sipil, vol. 3, no. 1, Agu 2021, doi: 10.37058/aks.v3i1.3561.

[8] M. H. Sujono, “Analisis Manajemen Risiko Proyek yang Berpengaruh Terhadap Waktu Pelaksanaan Proyek Hotel Quest by Aston Semarang,” J. Tek. Sipil Dan Arsit., vol. 26, no. 1, hlm. 64–71, Jan 2021, doi: 10.36728/jtsa.v26i1.1305.

[9] I. J. Simanjuntak, R. T. Siagian, R. Prasetyo, N. F. Rozak, dan H. H. Purba, “Manajemen Risiko Pada Proyek Konstruksi Jembatan: Kajian Literatur Sistematis,” J. Teknol. Dan Manaj., vol. 20, no. 1, hlm. 59–76, Feb 2022, doi: 10.52330/jtm.v20i1.47.

[10] E. Handayani, R. Zulfiati, dan M. A. I. Tsani, “Analisis Manajemen Risiko Pada Proyek Konstruksi Jalan di Provinsi Jambi,” J. Ilm. Univ. Batanghari Jambi, vol. 24, no. 1, hlm. 632, Feb 2024, doi: 10.33087/jiubj.v24i1.4937.

[11] C. K. Pertiwi dan I. A. A. Anggraeni, “Analisis Risiko Mutu Pelaksanaan Konstruksi Bendungan Leuwikeris Pekerjaan Paket 1,” J. Ilm. Desain Konstr., vol. 22, no. 2, hlm. 151–167, 2023, doi: 10.35760/dk.2023.v22i2.9895.

[12] B. D. Kussumardianadewi, A. E. Husin, dan A. Susianti, “Analysis of Key Factors for Successful Implementation of the Last Planner System to Improve Time Performance on Dam Projects,” MEDIA Komun. Tek. SIPIL, vol. 29, no. 2, hlm. 163–172, Jan 2024, doi: 10.14710/mkts.v29i2.49098.

[13] N. P. I. Yuliana dan N. K. S. Ebtha Yuni, “Manajemen Risiko Estimasi Biaya pada Tahap Perencanaan Proyek Konstruksi,” J. Ilm. Poli Rekayasa, vol. 19, no. 2, hlm. 92, Apr 2024, doi: 10.30630/jipr.19.2.360.

[14] K. Liu, Y. Liu, Y. Kou, X. Yang, dan G. Hu, “Efficiency of risk management for tunnel security of megaprojects construction in China based on system dynamics,” J. Asian Archit. Build. Eng., vol. 23, no. 2, hlm. 712–724, Mar 2024, doi: 10.1080/13467581.2023.2223696.

[15] H. G. Wayangkau, “Analisis Manajemen Risiko pada Proyek Pembangunan Bendungan (Studi kasus: Bendungan Titab di Bali, Bendungan Jatibarang di Kabupaten Semarang, dan Bendungan Diponegoro di Semarang), ,” J. Proy. Tek. Sipil, vol. 4, no. 1, hlm. 18–23, Apr 2021, doi: 10.14710/potensi.2021.10628.

Published

2025-01-30

How to Cite

[1]
Anugrah Mangaruk, J. E. Latupeirissa, and H. C. . Pascal Tiyouw, “Identification of Risks Affecting the Performance of Construction Time for Bandaraya Apartment”, PCEJ, vol. 7, no. 1, pp. 11–18, Jan. 2025, doi: 10.52722/zeye5650.