EVALUATION OF QUALITY MANAGEMENT IMPLEMENTATION IN THE CONSTRUCTION OF THE WAI PULU BRIDGE IN SERAM ISLAND

Authors

  • Andi Marsuki Universitas Kristen Indonesia Paulus Author
  • Jonie Tanijaya Universitas Kristen Indonesia Paulus Author
  • Erni Rante Bungin Universitas Kristen Indonesia Paulus Author
  • Yoel Pasae Universitas Kristen Indonesia Paulus Author

Abstract

This research aims to evaluate the level of quality implementation of sub-components and the achievement of quality management in the construction of the Wai Pulu Bridge, as well as provide solutions for construction work to meet the required quality standards in the Wai Pulu Bridge Construction Project. The research was conducted in Central Maluku Regency and Eastern Seram, Maluku Province, from March to May 2024. The research used a quantitative method, which was analyzed descriptively using statistics. The research methodology involved interviews and surveys with respondents from service providers, service users, and consultants, along with reviewing literature studies from similar research. The research results indicate that there are 7 variables for evaluating the achievement of quality management in the construction of the Wai Pulu Bridge, including: quality policy, quality manual, quality procedures, foundation work, substructure (abutment), and superstructure (floor plate). Strategies to improve the implementation of construction work include applying the quality policy sub-components, quality manual, quality procedures, and work instructions properly so that the quality of the work meets the required standards. Sub-components with lower importance should still be implemented in the field according to the technical specifications to ensure good quality work.

Published

2024-07-31