ANALYSIS OF THE IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) IN THE ACCELERATION OF BUILDING CONSTRUCTION MANADO STUDENTS' DORMITORY

Authors

  • Fardi Kalumata Universitas Kristen Indonesia Paulus Author
  • Jonie Tanijaya Universitas Kristen Indonesia Paulus Author
  • Erni Rante Bungin Universitas Kristen Indonesia Paulus Author

Keywords:

building information modeling, fast track, navigation work simulation

Abstract

The construction of the Manado Student Dormitory (AMN) is one of a lot of priority governments, the construction of which is based on PP No. 106 of 2021. The aim of building the AMN is so that students from various regions studying in North Sulawesi can interact with each other, and get to know and respect each other's culture. After the Pre Construction Meeting (PCM), the owner instructed that acceleration be made by shortening the implementation time. To implement these instructions, the contractor PT. Widya Satria implemented the BIM (building information modeling) system to accelerate the work, by modeling the construction phase starting from BIM 3D (modeling), BIM 4D (scheduling), and BIM 5D (quantity take off). Accelerating work is carried out by applying the fast track method so that any work that has a long critical path time can be shortened by overlapping work between one stage and another that can be done together. The implementation results simulate that the work can be completed faster than the contract time with the worker requirement of 296 people, 1 (one) tower crane unit, and 1 (one) mobile crane work unit, even after implementing BIM in the construction of AMN Manado, all stakeholders It is easy for the holder to coordinate and control work progress.

Published

2024-07-31