Marioga, Sulistiawati, et al. “Faktor–Faktor Penyebab Keterlambatan Pada Pekerjaan Pile Cap (Studi Kasus: Proyek Upgrade Trans Studio Mall Makassar)”. Paulus Civil Engineering Journal, vol. 3, no. 3, Jan. 2024, pp. 321-9, https://doi.org/10.52722/z075pf23.