Abstract

In carrying out the work, it is generally very difficult to determine the most suitable alternative length of time for the execution of the work, where the capacity of one tool must match the planned execution time, but usually the service provider / partner does not have the equipment according to the specifications required in the job analysis. . To overcome this, it is necessary to have a good plan before carrying out any project activities. Equipment requirements are closely related to implementation time. The purpose of this study is to analyze the productivity and equipment requirements to complete the work based on the number and capacity of each equipment and determine the composition of the equipment and its operational settings.The research method is based on surveys or direct observations in the field, analysis and evaluation preceded by a literature study, where the evaluation is carried out by comparing the results of the analysis of the productivity of the equipment used by PT. X as a service provider with equipment needs according to the volume and duration of each job.The results of the analysis show that the equipment owned by PT. X as a service provider in the Road Improvement Project. Drs Dominggus Mandacan Arfak Mountains Regency, West Papua Province based on the volume and duration of each existing job, also based on scheduling, (S curve), the composition and allocation of equipment for each job, which is owned by PT. X is still lacking in terms of quantity

Published
2021-10-30