Analisis Faktor-Faktor Penyebab Rework Pada Pelaksanaan Gedung Olahraga (GOR) Tipe B Koya Timur Kota Jayapura

  • Ashari Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
  • Melly Lukman Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
  • Rais Rachman Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
Keywords: Rework, Desain Dokumentasi, Manajerial, Sumber Daya

Abstract

The east koya sports building construction project basically has an implementation plan and a predefined implementation schedule, when the project implementation should start, when the project must e completed, how the project should be carried out and how the resources are provided. This development refers to the estimates that existed at the time the schedule development plan was made, therefore problems may arise if there is a mismatch beetween the plans that have been made and the executor of the construction of the east B kota sports building, so what often happens is a rework.The purpose of this study is to determine the factors that causing the rework, the most dominant factors and the steps that must be taken when a rework occurs in the construction of the east b koya sport building. The sample was determined as many as 92 respondents by all staff and employess who work on the project. With the research method using a questionaire and data analysis validity test, reliability test and multiple regression test.The results of the analysis show that the factors causing the rework that have a positive and significant influence are design and documentation, managerial, and resources and the most dominant factors that influence the occurrence of rework in the construction of type b koya timur sports building are design and documentation due to errors and errors. Requests for new design changes are known after canstruction work is underway so that the contractor has to dismantle and rework the same work. Some of the items that are repeated iclude floor, wall, door, window, ceiling and roof work.

 

Keywords: Rework, Documentation Design, Managerial, Resources