Produktifitas Tenaga Kerja Pada Proyek Pembangunan Kantor Keuangan Kabupaten Seram Bagian Timur

  • Joko Bantar Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
  • Melly Lukman Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
  • Rais Rachman Program Studi Magister Teknik Sipil, Universitas Kristen Indonesia Paulus
Keywords: Produktivitas Tenaga Kerja, Work Sampling.

Abstract

Labor Productivity in the Construction Project of the Eastern Seram Regency Financial Office. Labor productivity is one aspect that is taken into account in estimating the cost of a job. Which resulted in many developments that were not in accordance with the duration of the contract. The purpose of the study was to observe the activities of the workforce in the construction of the Finance Office of the Eastern Seram Regency, Maluku. Among them are Ceramic Couple Work Activities, Ceiling Couple Work and Plastering Couple Work.The method used to calculate work productivity is the Work Sampling method. From the results of the analysis using the Work Sampling method, the average percentage (%) of the effective time of the workers on the ceramic pair work is 61.07%, the ceiling partner work is 64.38% and the plastering partner work is 60.04%. The productivity level of ceramic, plaster and ceiling workers in the construction of the Kab. Eastern Spooky is effective. And the results of the analysis show that the mean effective time of the workforce is in accordance with the time needed and the work time on this project meets the working time

Keywords: Labor Productivity, Work Sampling.